MR. JO Underlay-STD : The Dependable Middle Layer for Strong, Seamless Epoxy Floors
In the world of industrial flooring, not all underlays are created equal. Some are fast but limited, others strong but rigid. MR. JO Underlay-STD strikes the perfect balance — a versatile, workhorse-grade epoxy screed that delivers performance, ease of use, and value across a wide range of applications.
Whether you’re leveling concrete for a high-gloss topcoat, building up thickness under heavy equipment, or forming coved skirting — Underlay STD gets the job done, without compromise.
🔍 What Is It?
MR. JO Underlay-STD is a standard two-part epoxy base layer with adjustable filler loading. It’s designed for use under all MR. JO self-leveling flooring systems and even under chemical-resistant and protective coatings when extra build-up is needed.
🌟 Key Features
✅Dual application – same resin system used for both flow and tamp work
✅Balanced setting time – fast enough for project efficiency, slow enough for smooth working
✅Excellent adhesion – bonds firmly to concrete and Mr. JO primers
✅Mechanical strength – strong enough to resist impact, abrasion, and heavy traffic
✅Surface corrector – levels undulations, covers minor cracks, and hides surface defects
✅Compatible – works with all MR. JO topcoats: EcoFloor, SL, CRSL, Protectokot, Floorkot
🧱 Where to Use
- Warehouses, shopfloors, and corridors
- Loading docks and ramps
- Battery rooms, chemical zones (when topcoat is resistant
- Areas with uneven concrete or patch repairs
- Substrate preparation for 2 mm+ self-level epoxy systems
- Covings and vertical upturns using tampable version

📋 Application Process
- Surface Prep
- Mechanically clean via shot blasting or grinding
- Concrete must be firm (25 MPa+), dry, oil- and dust-free
- Priming
- Use MR. JO Primer-MVC, LVC, UPS or Eco Primer, based on substrate condition
- Apply underlay while primer is still tacky or within recoat window
- Mixing
- Mix Part A and B thoroughly for 2–3 minutes
- Gradually add Part C (quartz filler) and mix to uniform consistency
- Use low-speed mixer for even distribution
- Application
- Flowable: Pour, spread with rake, and level with spike roller
- Tampable: Apply with trowel and compact; finish surface to desired texture
- Curing
- Tack-free in 6–8 hours (at 25°C), light foot traffic after 24 hrs
- Full cure in 7 days
Topcoat within 24–48 hours after underlay application
⚠️ Precautions
- Do not dilute with solvent or water
- Mix only full units; maintain correct ratio for structural integrity
- Do not apply on moist or contaminated substrates without using the correct primer (e.g., UPS)
- Protect fresh layer from water, dust, and direct sunlight until cured
🧠 Why Choose MR. JO Underlay-STD?
- 🛡️Reliable strength and adhesion
- 🔧Flexible enough for multiple job profiles
- 💡Economical and versatile
- 🔗Seamless integration with all Mr. JO flooring topcoats

From industrial mega floors to site repairs, Underlay-STD ensures your base is as solid as your finish. Because a great floor starts from beneath — and MR. JO knows how to build it up right.
Leave a Reply